The manufacturing team always enjoy the challenge of working on new products and the Campbells Soup outdoor enclosure was one of those projects. The client required a design that allowed access to the HV switchgear yet had space constraints preventing standard doors from being used.
Our design team developed a solution using a roller door allowing the required access without impeding on the available space.
Working to a tight schedule, the team managed to manufacture and deliver in only four weeks.