Trivantage Manufacturing delivered a fully operational transportable switchroom to a client in Werribee, Victoria. Our team handled the structural and electrical design, collaborating with all stakeholders from the initial concept to factory and site acceptance.
The switchroom, measuring 7.2 meters long and 3.2 meters wide, included the manufacture of the main switchboard and PLC control panels. We also installed fire services, variable speed controls, and air conditioning. Additionally, we provided stairs, platforms, and support pillars as part of the complete solution.